< Back To Projects

Shiseido

Renovation of 10 floors (300,000 square feet). All new MEP Systems throughout. New structural for interconnecting staircases, column reinforcement and slab infills.

Mechanical Systems – Firestop, Draftstop and Fireblock Systems – Sprayed Fire Resistant Materials – Fire Resistance Rated Construction – Structural Steel Welding – Structural Steel Details – Structural Steel Erection & Bolting – Concrete Cast in Place – Structural Stability – Heating Systems – Sprinkler Systems – Mastic Intumescent Fire Resistant Coatings – Post Installed Anchors – Final Inspection – Energy Code Compliance