< Back To Projects

Crocs

ETI was called upon to perform the inspections of the renovation and fit-out of the three story building for Crocs

Firestop, Draftstop and Fireblock Systems – Structural Steel Welding – Structural Steel Erection & Bolting – Sprinkler Systems – Final Inspection – Footing and Foundation – Concrete Cast in Place – Sprayed Fire Resistant Materials – Fire Resistance Rated Construction – Energy Code Compliance