< Back To Projects

COLLEGE POINT LOGISTICS CENTER

ETI was retained for all the special inspections and testing items for College Point Logistics Center. This warehouse and parking facility is 249,675 square feet and is located on a four acre site. It features 36 foot ceilings and the ability to support 800 PSF floor loads. The enclosed parking spreads across the second and third floor with warehouse space including loading docks on the ground floor.

Concrete Cast in Place – Concrete Testing – Concrete Precast – Fire Resistance Rated Construction – Fire Resistant Penetrations and Joints – Sprayed Fire Resistant Materials – Structural Steel Welding – Structural Steel High Strength Bolting – Structural Steel Details – Structural Cold Formed Steel – Post Installed Anchors – Sprinkler Systems – Standpipe Systems – Mechanical Systems – Heating Systems – Masonry – Footing and Foundation – Luminous Egress Path Markings – Subsurface/Soils-Fill Placement In-Place Density – Wall Panels, Curtain Walls and Veneers – Energy Code Compliance – Concrete Cylinder Testing – Ultrasonic Testing – Magnetic Particle Testing – Final Inspection