< Back To Projects

550 Madison Ave

The scope of project involves a completed infrastructure upgrade to the base building equipment, structural reinforcement throughout the floors, cellar and sub cellar to support the new equipment and uses. The project has three phases with multiple DOB applications and inspections. These phases are still ongoing. The building is roughly 37 stories.

Concrete Cast in Place – Concrete Testing – Mechanical Systems – Fire Resistive Penetration and Joints – Sprayed Fire Resistant Materials  – Fire Resistance Rated Construction – Structural Steel Welding – Structural Steel Details – Structural Steel High Strength Bolting – Post Installed Anchors – Smoke Control Systems – Fuel Oil Piping – Emergency Generator – High Pressure Steam – Sprinkler Systems – Standpipe Systems – Masonry – Wall Panels – Luminous Exit Path Markings – Concrete Cylinder Compression – Concrete Cores (Sidewalks) – Fire Proofing Density Samples – Energy Code Exempt – Landmark Building